Poland’s future central airport to add two board‑catering logistics buildings
Based on · First reported
Sources
- Port Polska is constructing two logistics buildings for board catering at the new Polish central airport, with the structures located adjacent to the air side for two independent caterers. The design‑planning contract was awarded to Projmors ASE Group in October 2025 and is valued at over 3 million Zloty (about 686,000 Euro).
- The airport, planned to open in 2032, is designed as a hub linking air, rail and road transport and is expected to handle between 34 and 44 million passengers in its first stage, making the catering facilities a key component of its ground‑handling infrastructure.
Why it matters
The addition of dedicated catering buildings supports the airport’s hub strategy by ensuring ready‑made food services for a high passenger volume from day one.
How we use AI · Report an error
Related stories
- Russian Tu-95MS strategic bomber crashes near Krasnojaro village
- Bomb alarm triggers evacuation and suspends check‑in at Chisinau airport
- First Poste Air Cargo flight links Taranto‑Grottaglie with Istanbul
- Tigray Peace Forces claim full control of Mekelle Alula Aba Nega Airport
- Air traffic controller Jake Hutzler flies himself to Pueblo airport