Two catering warehouses to be built beside new airport for faster aircraft service
Based on · First reported
Sources

- Two independent catering facilities, each serving a different operator, will be built directly adjacent to the airside zone of the new airport, providing storage, loading and logistics for cabin catering and onboard sales.
- The design contract was signed in October 2025, with project documentation prepared by Projmors ASE Group and a value exceeding 3 million PLN, and the airport is slated to open to passengers in 2032 with an initial capacity of 34–44 million passengers per year.
Why it matters
The adjacent location is intended to reduce aircraft handling and product storage times while increasing overall logistics throughput for airlines.
How we use AI · Report an error
Related stories
- U.S. Coast Guard searches for missing Gulfstream G100 off Nantucket
- France to raise aviation taxes, sparking airline and airport concerns
- FlyDubai Flight 1073 diverted to Saudi Arabia after cockpit stabbing
- Pune airport customs seize 1.243 kg cannabis hidden in cosmetic jars
- Frontier’s 2019 tipping experiment drew criticism from flight‑attendant union