Deutsche Aircraft launches D328eco assembly line in Leipzig
Based on · First reported
Sources
- Deutsche Aircraft opened a new assembly line in Leipzig on September 29, dedicated to its D328eco program and covering 60,500 square metres.
- The Leipzig facility can produce up to 48 D328eco aircraft per year, while the existing Oberpfaffenhofen site will continue to handle engineering, flight testing and certification, making Leipzig the central hub for assembly and delivery.
Why it matters
The added capacity and dedicated delivery hub could increase the supply of D328eco aircraft to airlines and operators, influencing fleet planning and market availability.
How we use AI · Report an error
Related stories
- FlyDubai pilot stops co‑pilot hijacking attempt on flight with 170 people
- Air traffic controller Jake Hutzler flies a paramotor to Pueblo Airport each week
- Flydubai flight to Tel Aviv diverted to Tabuk after onboard stabbing
- US deploys third carrier strike group and boosts troop presence in Middle East
- The opening flight of the Boeing 737 MAX 8 "Ivan Patzaichin", operated by airline TAROM