Airbus weighs second A350 assembly line as long‑haul demand rises

Written by AI from 1 report listed below. Not checked by a person before publication. How we use AI
Airbus is preparing to decide on a second A350 assembly line to increase long‑haul aircraft production, while its existing line is designed to produce 12–13 aircraft per month.
The company targets building 12 A350s per month in 2028 and is studying stretched versions called the A350‑2000 and A220‑500, with decisions expected early in its next five‑year planning period, though neither programme has been formally launched.
Analysed 1 report from 1 publisher
Used in this story
How we use AI · Report an error

