Orlando International Airport launches upgraded APM service to Gates 100–129

Orlando International Airport launches upgraded APM service to Gates 100–129
Image: airportindustry-news.com

Written by AI from 1 report listed below. Not checked by a person before publication. How we use AI

Orlando International Airport (MCO) began operating an upgraded automated people mover (APM) service to Gates 100–129 on 13 October, introducing new vehicles and modernised infrastructure on the first of two tracks serving those gates.

The Gate Link Replacement Project, costing $253 million, replaces running surfaces, power distribution equipment, vehicle controls, communications and operating systems, and adds platform screen doors, with each new set of cars able to carry up to 240 passengers; work will later move to the second track for Gates 100–129 and then to Gates 70–99 where both tracks, trams and associated systems will be upgraded.

Analysed 1 report from 1 publisher

Used in this story

How we use AI · Report an error

In this post

Latest

  1. DRV, VIR, ASR and BTW: RTK chief Bösl wants stronger roofing
  2. Nomad promotion offers up to 15,000 Azul points for new account conversions
  3. LATAM Pass offers 25% bonus on credit card points transfers; ALL Accor adds up
  4. Festus Keyamo says Nigerian Meteorological Agency vital for aviation safety
  5. Africa holds about 30% of global weather observation capacity, creating data gap
  6. Tillamook Air Museum to reopen Oct. 29 after $1 purchase and roof repairs
  7. Delta reports 28% rise in MRO revenue to $990 million year‑to‑date
  8. Icelandair Continues to List 757/767 Schedule to early-Jan 2027
All latest posts

Welcome back

Enter your email and password.

New to Terminair?