Fuzhou Changle Airport details its history and Terminal 2 design features
Written by AI from 1 report listed below. Not checked by a person before publication. How we use AI
Chief engineer 念朝华 has worked on Fuzhou Changle Airport since 1993; the airport was selected in 1991, its foundation was laid in 1993 and it opened on 23 June 1997.
Terminal 2’s first‑floor curtain wall glass is 2.25 m high, while upper floors use staggered 1.5 m and 1.125 m glass panels for lighting, energy saving and maintenance convenience, and its roof construction method won the national Jin Yu Award for waterproofing.