US Air Force evaluates restart of Boeing C‑17 production
Based on · First reported
Sources

- On September 16, Lt. Gen. Daniel Tulley said the Air Force is formally evaluating a production restart of the Boeing C‑17 Globemaster III, a step included in the Next‑Generation Airlift (NGAL) Analysis of Alternatives.
- The House Armed Services Committee has ordered a feasibility report on the restart, covering tooling status, supplier viability and cost, with a deadline of March 1 2027; the C‑17 line was closed in 2015 after 279 aircraft were built, and the service currently operates between 219 and 222 C‑17s.
How we use AI · Report an error
In this story
Related stories
- Flydubai flight from Dubai to Tel Aviv attacked by Omani co‑pilot, prompting Israeli
- Flydubai flight from Dubai to Tel Aviv diverted to Tabuk after cockpit stabbing
- Boeing secures $20‑$50 B Air Force fighter contract and $20 B Navy F/A‑XX deal
- Boeing T-7A Red Hawk achieved first flight in 36 months with about 50% fewer assembly
- Unpaid landing fees mount for ICE charter flights at Akron‑Canton Airport